US listed · Nasdaq · VIP

Vulcan Infrastructure and Power Inc. 9-count (US listed)

The 9 on Vulcan Infrastructure and Power Inc. is still nine closes versus four back. This page is VIP in US listed, plus the last scanned structure if we have one.

Scan date 2026-09-04 · Last 1.89

Count 3
Daily
No finished 13
13
No finished daily 9
Weekly

Last scanned structure for VIP. A count, not an order.

Daily candles · 9 marks

Tap a candle for the crosshair. Tap a 9 to highlight 1–9. Alerts and replay live in the app.

9 678

Labels start at 6. Fail the ninth and 1–8 vanish. After the close. Not an order.

VIP on Nasdaq

In data feeds: VIP. The quote screen more often shows VIP. Exchange: Nasdaq. Market: US listed.

The rule does not change because Vulcan Infrastructure and Power Inc. is famous or obscure.

NineRadar lists who finished after the close on the hot list and the watchlist. If VIP is absent, the stretch may be unfinished, or it was not in the last scan.

After the close

Vulcan Infrastructure and Power Inc. only takes the US listed cash close. Do not mix HK, US, CN, and KR on one “today” line.

A low-9 is not a buy. A high-9 is not a sell. A one-way tape can print several 9s and never turn.

The same rule as every other name

On Vulcan Infrastructure and Power Inc., a daily 9 is nine closes versus the close four bars back. Below prints a low-9. Above prints a high-9. Fail bar 9 and 1–8 vanish.

Labels usually start at 6. A 13 waits for a finished 9; bar 13 must pass bar 8’s close or it plots +.

US listed cash close is 16:00 New York. Lunch, after-hours, and a 120-minute print are other clocks.

Definitions: The 9 · The 13 · Glossary.

VIP: low-9, high-9, and 13

Answers for this name: scan date, 16:00 New York, low-9 / high-9, 13, alerts. A count, not an order.

Has VIP completed a daily magic nine?

As of scan date 2026-09-04, Vulcan Infrastructure and Power Inc. (VIP) is at daily count 3, not a finished 9. An unfinished stretch is the common day. Last on the scan: 1.89. On this daily chart the last finished 9 on Vulcan Infrastructure and Power Inc. is 2026-06-26 (high-9, close 1.76).

Is a low-9 on Vulcan Infrastructure and Power Inc. a bottom-picking signal?

Do not treat a low-9 on Vulcan Infrastructure and Power Inc. as a buy, or a high-9 as a sell. A low-9 is nine daily closes below the close four bars back. A high-9 is nine closes above that bar. Vulcan Infrastructure and Power Inc. can print several 9s in a one-way tape and never turn.

Why is the 9 on Vulcan Infrastructure and Power Inc. different in my charting app?

It should match: nine closes versus four bars back; fail the ninth and the stretch clears. The quote code is VIP. If two terminals disagree, check timeframe (daily vs daily), adjustment mode, and whether an intraday print was treated as the close. NineRadar’s extra job is the after-close list, not another line on the chart.

Which close does Vulcan Infrastructure and Power Inc. use for a daily 9?

Vulcan Infrastructure and Power Inc. is US listed (Nasdaq). The daily 9 waits for the 16:00 New York cash close. Pre-market and after-hours are not the cash close. A 60- or 120-minute 9 is another clock. Do not paste it into the same “today’s daily 9” line.

Why is there no 13 after a 9 on Vulcan Infrastructure and Power Inc.?

As of 2026-09-04, Vulcan Infrastructure and Power Inc. is at 13-count 12, not finished. An empty or unfinished 13 is the common day.

Will this website notify me when Vulcan Infrastructure and Power Inc. prints a 9?

The website does not push. Install Nine Radar on iOS and add VIP (Vulcan Infrastructure and Power Inc.) to the watchlist (free: eight names). Pro can push a finished 9 or 13 to the lock screen after the 16:00 New York cash close. Finished 60/120-minute 9s live in the app only.

Do the web and iOS use the same 6–9 marks on Vulcan Infrastructure and Power Inc.?

Daily 6–9 marks use the same count: closes versus four bars back, labels from 6. This page is for reading Vulcan Infrastructure and Power Inc. after the close (chart as of 2026-09-04). Lock-screen alerts, 60/120-minute counts, and closed-pair replay are in the iOS app. The website does not shout a 9 during the bar.

Does Vulcan Infrastructure and Power Inc. bounce after a low-9?

NineRadar does not publish an accuracy rate for Vulcan Infrastructure and Power Inc., and it does not call a low-9 a bottom or a high-9 a top. Replay scores closed pairs only: a low-9 waits for the next high-9. Vulcan Infrastructure and Power Inc. can print several 9s in a one-way tape. History does not forecast the next bar.

More US listed

All US listed names

On this site

A count, not an order. Questions: support@nineradar.com.